Sunday, February 17, 2008

Pond life - finishing the form

The digger has been back to place gravel and a drainage tube behind the high wall. He has also sculpted the soil around the low wall to make a smooth profile with a little dip: the aim of this is to catch any debris from the plants that may slip down the slope. We are now ready for the impermeable liner which should arrive at the end of the month.

Y

No comments: